top of page

AERIAL QUICK CHANGE

TECHNICAL RIDER

RIGGING SPECIFICATIONS:

Access to the onsite rigger prior to the event or a site visit to establish rigging specifications

18' - 27' / 5.5 - 8.5 meters rigging height, rated no less than 1000lbs / 450kg

10' / 3 meters diameter clearance (5' / 3 meters on all sides of the rigging point)

(higher points can be accommodated with additional rigging on a case by case basis... see photo / drawing modifications)

Winch rated to human dynamic weight, a chain motor can be accommodated with additional rigging.  

Rigging could take between 2 and 5 hrs depending on location and requirements. Set rigging times should leave time for required rehearsals and event schedule.

FLOOR SPECIFICATIONS:

Level dance flooring / marley preferred

10' / 3 meter diameter clearance 

ON-SITE NEEDS AND SPECIFICATIONS:

Warm / temperate dressing room

2 hour personal rehearsal prior to the event, preferably the day before or morning before the event

General event schedule and performance times

TRAVEL AND LODGINGS:

Direct flights when possible, longer flights should have a window or aisle option

Luggage (usually a weekend requires one checked bag and one carry-on, sometimes tech requires additional checked luggage) 

Lodgings - 2 separate rooms for myself and partner

RATE:

Rate determined by the length and distance of event

Travel, accommodations and per diem

50% of rate received 1 week prior to traveling to the event

Travel Insurance coverage on all checked luggage up to $10,000

IMG_4980.jpg
IMG_4423_edited.jpg
IMG_4982.jpg
B312BB62-FE46-416B-A392-3A30BDF8F767.JPG
bottom of page