AERIAL QUICK CHANGE
TECHNICAL RIDER
RIGGING SPECIFICATIONS:
Access to the onsite rigger prior to the event or a site visit to establish rigging specifications
18' - 27' / 5.5 - 8.5 meters rigging height, rated no less than 1000lbs / 450kg
10' / 3 meters diameter clearance (5' / 3 meters on all sides of the rigging point)
(higher points can be accommodated with additional rigging on a case by case basis... see photo / drawing modifications)
Winch rated to human dynamic weight, a chain motor can be accommodated with additional rigging.
Rigging could take between 2 and 5 hrs depending on location and requirements. Set rigging times should leave time for required rehearsals and event schedule.
FLOOR SPECIFICATIONS:
Level dance flooring / marley preferred
10' / 3 meter diameter clearance
ON-SITE NEEDS AND SPECIFICATIONS:
Warm / temperate dressing room
2 hour personal rehearsal prior to the event, preferably the day before or morning before the event
General event schedule and performance times
TRAVEL AND LODGINGS:
Direct flights when possible, longer flights should have a window or aisle option
Luggage (usually a weekend requires one checked bag and one carry-on, sometimes tech requires additional checked luggage)
Lodgings - 2 separate rooms for myself and partner
RATE:
Rate determined by the length and distance of event
Travel, accommodations and per diem
50% of rate received 1 week prior to traveling to the event
Travel Insurance coverage on all checked luggage up to $10,000